Interconnection agreement

LinkedIn LinkedIn Copy Link Copy Link

What is it?

​​​​The Interconnection Agreement Template covers the default terms and conditions for the minimum mandatory content of an interconnection agreement, based on the Code's requirements. In case transmission system operators fail to agree on one or more contractual terms, this template can be annexed to the agreement indicating default rules for the disagreed term(s).

An Interconnection agreement is made between adjacent transmission system operators, whose systems are connected at a particular interconnection point. This agreement specifies terms and conditions, operating procedures and provisions with respect to delivery and/or withdrawal of gas at the interconnection point.

Why is there an agreement specific template?

​The template covers the mandatory terms for an Interconnection Agreement. It provides ready-made solutions to facilitate the signature of these agreements between transmission system operators if they cannot agree. The mandatory terms of an interconnection agreement cover:

  • rules for flow control

  • measurement principles for gas quantities and quality

  • rules for the matching process

  • rules for the allocation of gas quantities

  • communication procedures in case of exceptional events

  • settlement of disputes arising from interconnection agreements

  • amendment process for the interconnection agreement.

What does ACER say?

​Interconnection agreements are mostly signed with a high level of compliance. The Agency recommended that by the end of 2020 national regulatory authorities proactively assess these agreements to further increase compliance and report to the Agency.​​

 

 

EU gas supply sourcing costs fell to record low in 2020 due mainly to COVID-19 gas demand reductions and record LNG deliverieshttps://documents.acer.europa.eu/Media/News/Pages/EU-gas-supply-sourcing-costs-fell-to-record-low-in-2020-due-mainly-to-COVID-19-gas-demand-reductions-and-record-LNG-deliver.aspx25/04/2021 23:00:00EU gas supply sourcing costs fell to record low in 2020 due mainly to COVID-19 gas demand reductions and record LNG deliveries
ACER and CEER recommend when and how to regulate pure hydrogen networkshttps://documents.acer.europa.eu/Media/News/Pages/ACER-and-CEER-recommend-when-and-how-to-regulate-pure-hydrogen-networks.aspx09/02/2021 00:00:00ACER and CEER recommend when and how to regulate pure hydrogen networks
Regulators welcome the Commission’s Trans-European Networks for Energy (TEN-E) proposals but see scope for further improvement for energy network developmenthttps://documents.acer.europa.eu/Media/News/Pages/Regulators-welcome-the-Commission’s-Trans-European-Networks-for-Energy-(TEN-E)-proposals-but-see-scope-for-further-improvem.aspx16/12/2020 00:00:00Regulators welcome the Commission’s Trans-European Networks for Energy (TEN-E) proposals but see scope for further improvement for energy network development