A brief historic introduction

​​​​​​​Following the Framework Guidelines o​​​​n Electricity System Operation, four network codes were initially developed:

  • Network Code on Operational Security

  • Network Code on Operational Planning and Scheduling

  • Network Code on Load-frequency Control and Reserves

  • Network Code on Emergency and Restoration

During the adoption process led by the European Commission, the Network Codes on Operational Security, Operational Planning and Scheduling and Load-frequency Control and Reserves were merged into the Guideline on Electricity Transmission System Operation.​

 

 

Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)https://documents.acer.europa.eu/Media/News/Pages/Building-trans-European-energy-infrastructure.aspx10/06/2021 23:00:00Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)
Continental Europe electricity system separation incident of 8 January 2021: Next stepshttps://documents.acer.europa.eu/Media/News/Pages/Continental-Europe-electricity-system-separation-incident-of-8-January-2020.aspx26/02/2021 00:00:00Continental Europe electricity system separation incident of 8 January 2021: Next steps
ACER reports on electricity distribution tariff methodologies in Europe and recommends how to improve themhttps://documents.acer.europa.eu/Media/News/Pages/ACER-reports-on-electricity-distribution-tariff-methodologies-in-Europe-and-recommends-how-to-improve-them.aspx10/02/2021 00:00:00ACER reports on electricity distribution tariff methodologies in Europe and recommends how to improve them