Capacity allocation and congestion management

LinkedIn LinkedIn Copy Link Copy Link

​​The CACM Regulation

​​​​​​​​​​​​​​​​​​​​The CACM Regul​ation provides binding rules for the implementation and operation of EU-wide single market coupling in the day-ahead and intraday timeframes. These rules apply to the transmission system operators (TSOs), Nominated Electricity Market Operator (NEMOs), regulatory authorities and ACER. ​

 

 

Cost of electricity losses driving significant increase in Inter-TSO compensation fund which now reaches 289 million euroshttps://documents.acer.europa.eu/Media/News/Pages/Cost-of-electricity-losses-driving-significant-increase-in-Inter-TSO-compensation-fund-which-now-reaches-289-million-euros-.aspx02/12/2020 00:00:00Cost of electricity losses driving significant increase in Inter-TSO compensation fund which now reaches 289 million euros
ACER reports on electricity distribution tariff methodologies in Europe and recommends how to improve themhttps://documents.acer.europa.eu/Media/News/Pages/ACER-reports-on-electricity-distribution-tariff-methodologies-in-Europe-and-recommends-how-to-improve-them.aspx10/02/2021 00:00:00ACER reports on electricity distribution tariff methodologies in Europe and recommends how to improve them
ACER to decide on the electricity cross-zonal capacity allocation methodologies for the exchange of balancing capacity in 19 EU Member Stateshttps://documents.acer.europa.eu/Media/News/Pages/ACER-to-decide-on-the-electricity-cross-zonal-capacity-allocation-methodologies-for-the-exchange-of-balancing-capacity-.aspx11/04/2021 23:00:00ACER to decide on the electricity cross-zonal capacity allocation methodologies for the exchange of balancing capacity in 19 EU Member States