Skip Ribbon Commands
Skip to main content

European Stakeholder Committees​

 
European Stakeholder Committees (ESCs) have been established to inform and consult stakeholders about the requirements in the guidelines/network codes during the implementation period. To this end, ACER and ENTSO-E shall co-organise regular meetings to identify problems and propose improvements to the guidelines/network codes.
 
There are three different ESCs, each covering a family of network codes. The relevant ESCs are provided below.
 

Grid Connection

The Grid Connection ESC shall cover the following network codes:
 
  • Network code on requirements for grid connection of generators
  • Network code on demand connection
  • Network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules

The latest draft of the Terms of Reference is available in the link below.

22012016 Grid Connection ESC Final Draft ToR.pdf22012016 Grid Connection ESC Final Draft ToR.pdf

    

Information related to the Grid Connection ESC, including meeting dates and minutes can be found on the ENTSO-E website (link below). The Member Associations can also be viewed on the same link.

 

ENTSO-E Grid Connection ESC onlinespace 

 
 

Market

The Market ESC shall cover the following guidelines:
 
  • Guideline on forward capacity allocation 
  • Guideline on capacity allocation and congestion management 
  • Guideline on electricity balancing
The latest draft of the Terms of Reference is available in the link below.
 

20150929 Market ESC Final Draft ToR.pdf20150929 Market ESC Final Draft ToR.pdf

  

Information related to the Market ESC, including meeting dates and minutes can be found on the ENTSO-E website. The Member Associations can also be viewed on the same link.

 

ENTSO-E Market ESC online space

 

System Operation

  

Information related to this ESC will be published in due time, before the entry into force of the relevant network code/guidelines.

 ​