Demand connection

LinkedIn LinkedIn Copy Link Copy Link

The DCC Regulation

​​​​​​​​​​​​​The Demand Connection Network Code (DCC Regulation) sets harmonised standards for connecting large renewable energy production plants and integrate demand response. The Regulation entered into force on 7 September 2016. ​

The core elements

​The DCC Regulation provides that:

  • The connection standards apply to new transmission-connected demand and distribution facilities, new distributions systems and to demand units providing demand response (including any pumping module within the station that provides pumping mode only).

  • The relevant system operator can refuse the connection when the requirements of the Regulation are not met, and when a derogation is not granted by a regulatory or other authority, where applicable in a Member State.
     

  • The connection requirements should not apply to demand facilities and distributions systems connected to transmission and distributions systems of islands of Member States which are not operated synchronously with either Continental Europe, Great Britain, Nordic, Ireland and Northern Ireland or Baltics synchronous area. The DCC Regulation shall not apply to an existing transmission connected demand facility or distribution facility or an existing distribution system with the exceptions defined.

 

 

ACER releases its second 70% target report on the minimum margin available for cross-zonal electricity trade in the EUhttps://documents.acer.europa.eu/Media/News/Pages/ACER-releases-its-second-70-target-report-on-the-minimum-margin-available-for-cross-zonal-electricity-trade-in-the-EU.aspx01/06/2021 23:00:00ACER releases its second 70% target report on the minimum margin available for cross-zonal electricity trade in the EU
ACER to decide on the long-term cross-border capacity calculation methodology for the Core region, comprised of 13 Member Stateshttps://documents.acer.europa.eu/Media/News/Pages/ACER-to-decide-on-the-long-term-cross-border-capacity-calculation-methodology-for-the-Core-region,-comprised-of-13-Member-S.aspx03/06/2021 23:00:00ACER to decide on the long-term cross-border capacity calculation methodology for the Core region, comprised of 13 Member States
Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)https://documents.acer.europa.eu/Media/News/Pages/Building-trans-European-energy-infrastructure.aspx10/06/2021 23:00:00Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)